US Bridges

SR 469 over Relief

Good

Rankin County, Mississippi · 1.5 MI S SR 468 · Structure no. 310046906102920

Built
1986
39 years old
Condition
Good
inspected October 2024
Type
Slab
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
5,100
2023 count
Owner
State
State Highway Agency

About this bridge

SR 469 over Relief is a prestressed concrete slab carrying SR 469 over Relief in Rankin County, Mississippi. It was built in 1986, so it is 39 years old, older than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,100 vehicles a day, roughly 6% of them trucks, projected to reach 5,100 by 2043. The structure is 120 ft (36.6 m) long and 39 ft wide. If it were closed, the detour would be 21.7 mi (35 km).

CarriesSR 469
CrossesRelief
Location1.5 MI S SR 468
RouteState Highway 469
Coordinates32.20745, -90.05317
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.6 US tons
Inventory rating40.5 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,100 (2023)
Projected traffic5,100 by 2043
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 469 over Relief built?

It was built in 1986, making it 39 years old in 2025.

What condition is SR 469 over Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does SR 469 over Relief carry?

About 5,100 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is SR 469 over Relief?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 39 ft wide.

Who owns SR 469 over Relief?

It is owned by the State Highway Agency.