US Bridges

Chicasa Road over Redland Creek

Good

Pontotoc County, Mississippi · Sec 21 T11S R 3E · Structure no. SA580000000A078

Built
2019
6 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
21 ft
200 main spans
Daily traffic
50
2014 count
Owner
County
County Highway Agency

About this bridge

Chicasa Road over Redland Creek is a concrete culvert carrying Chicasa Road over Redland Creek in Pontotoc County, Mississippi. It was built in 2019, so it is 6 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2034. The structure is 21 ft (6.4 m) long and 45 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesChicasa Road
CrossesRedland Creek
LocationSec 21 T11S R 3E
RouteCounty Highway 128
Coordinates34.10874, -88.99322
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60.8 US tons
Inventory rating47 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans200
Design loadH 15
Structure length21 ft (6.4 m)
Longest span10 ft (3.1 m)
Deck width45 ft (13.6 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2014)
Projected traffic75 by 2034
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Chicasa Road over Redland Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Chicasa Road over Redland Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Chicasa Road over Redland Creek carry?

About 50 vehicles per day (2014 count).

How long is Chicasa Road over Redland Creek?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3.1 m) and a deck 45 ft wide.

Who owns Chicasa Road over Redland Creek?

It is owned by the County Highway Agency.