US Bridges

SR 41 over Chiwapa Creek Relief

FairPosted for load

Pontotoc County, Mississippi · 4.0 MI S SR 15 · Structure no. 310004105802710

Built
1955
70 years old
Condition
Fair
inspected April 2024
Type
Slab
Concrete Continuous
Length
140 ft
7 main spans
Daily traffic
2,600
2023 count
Owner
State
State Highway Agency

About this bridge

SR 41 over Chiwapa Creek Relief is a concrete continuous slab carrying SR 41 over Chiwapa Creek Relief in Pontotoc County, Mississippi. It was built in 1955, so it is 70 years old, older than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 2,600 vehicles a day, roughly 10% of them trucks, projected to reach 2,600 by 2043. The structure is 140 ft (42.7 m) long and 29 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesSR 41
CrossesChiwapa Creek Relief
Location4.0 MI S SR 15
RouteState Highway 41
Coordinates34.18109, -88.95816
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37 US tons
Inventory rating22.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 15
Structure length140 ft (42.7 m)
Longest span20 ft (6.1 m)
Deck width29 ft (8.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,600 (2023)
Projected traffic2,600 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1,000 million
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 41 over Chiwapa Creek Relief built?

It was built in 1955, making it 70 years old in 2025.

What condition is SR 41 over Chiwapa Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does SR 41 over Chiwapa Creek Relief carry?

About 2,600 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is SR 41 over Chiwapa Creek Relief?

The structure is 140 ft (42.7 m) long with a longest span of 20 ft (6.1 m) and a deck 29 ft wide.

Who owns SR 41 over Chiwapa Creek Relief?

It is owned by the State Highway Agency.