Stewart Mill Road over Large Drain
FairPike County, Mississippi · Sec 33 T 4N R 8E · Structure no. SA5700000000166
- Built
- 1978
- 47 years old, rebuilt 2016
- Condition
- Fair
- inspected February 2023
- Type
- Channel Beam
- Concrete
- Length
- 114 ft
- 6 main spans
- Daily traffic
- 140
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Stewart Mill Road over Large Drain is a concrete channel beam carrying Stewart Mill Road over Large Drain in Pike County, Mississippi. It was built in 1978 and reconstructed in 2016, so it is 47 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 140 vehicles a day, roughly 8% of them trucks, projected to reach 210 by 2044. The structure is 114 ft (34.7 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stewart Mill Road over Large Drain built?
It was built in 1978, making it 47 years old in 2025. It was reconstructed in 2016.
What condition is Stewart Mill Road over Large Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Stewart Mill Road over Large Drain carry?
About 140 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Stewart Mill Road over Large Drain?
The structure is 114 ft (34.7 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.
Who owns Stewart Mill Road over Large Drain?
It is owned by the County Highway Agency.