Osyka Progress Rd. over Bala Chitto Creek
FairPike County, Mississippi · Sec 28 T 1N R 8E B · Structure no. SA5700000000035
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 193 ft
- 5 main spans
- Daily traffic
- 610
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Osyka Progress Rd. over Bala Chitto Creek is a prestressed concrete stringer/multi-beam or girder carrying Osyka Progress Rd. over Bala Chitto Creek in Pike County, Mississippi. It was built in 1991, so it is 34 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 610 vehicles a day, roughly 8% of them trucks, projected to reach 915 by 2043. The structure is 193 ft (58.8 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Osyka Progress Rd. over Bala Chitto Creek built?
It was built in 1991, making it 34 years old in 2025.
What condition is Osyka Progress Rd. over Bala Chitto Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Osyka Progress Rd. over Bala Chitto Creek carry?
About 610 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is Osyka Progress Rd. over Bala Chitto Creek?
The structure is 193 ft (58.8 m) long with a longest span of 60 ft (18.3 m) and a deck 31 ft wide.
Who owns Osyka Progress Rd. over Bala Chitto Creek?
It is owned by the County Highway Agency.