US Bridges

Magnolia-Progress over Bala Chitto Creek

Fair

Pike County, Mississippi · Sec 2 T 1N R 8E B · Structure no. SA5700000000023

Built
1979
46 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
220 ft
5 main spans
Daily traffic
1,320
2021 count
Owner
County
County Highway Agency

About this bridge

Magnolia-Progress over Bala Chitto Creek is a prestressed concrete stringer/multi-beam or girder carrying Magnolia-Progress over Bala Chitto Creek in Pike County, Mississippi. It was built in 1979, so it is 46 years old, older than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,320 vehicles a day, roughly 8% of them trucks, projected to reach 1,980 by 2043. The structure is 220 ft (67.1 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMagnolia-Progress
CrossesBala Chitto Creek
LocationSec 2 T 1N R 8E B
RouteCounty Highway 177
Coordinates31.07714, -90.36989
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating68 US tons
Inventory rating39.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length220 ft (67.1 m)
Longest span60 ft (18.3 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,320 (2021)
Projected traffic1,980 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.4 million (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Magnolia-Progress over Bala Chitto Creek built?

It was built in 1979, making it 46 years old in 2025.

What condition is Magnolia-Progress over Bala Chitto Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Magnolia-Progress over Bala Chitto Creek carry?

About 1,320 vehicles per day (2021 count), of which roughly 8% are trucks.

How long is Magnolia-Progress over Bala Chitto Creek?

The structure is 220 ft (67.1 m) long with a longest span of 60 ft (18.3 m) and a deck 31 ft wide.

Who owns Magnolia-Progress over Bala Chitto Creek?

It is owned by the County Highway Agency.