Osyka Progress Rd. over Relief Tangipahoa River
GoodPike County, Mississippi · Sec 36 T 1N R 7E B · Structure no. SA5700000000019
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected February 2023
- Type
- Slab
- Concrete
- Length
- 171 ft
- 9 main spans
- Daily traffic
- 1,100
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Osyka Progress Rd. over Relief Tangipahoa River is a concrete slab carrying Osyka Progress Rd. over Relief Tangipahoa River in Pike County, Mississippi. It was built in 2001, so it is 24 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,100 vehicles a day, roughly 8% of them trucks, projected to reach 1,650 by 2043. The structure is 171 ft (52.1 m) long and 39 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Osyka Progress Rd. over Relief Tangipahoa River built?
It was built in 2001, making it 24 years old in 2025.
What condition is Osyka Progress Rd. over Relief Tangipahoa River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Osyka Progress Rd. over Relief Tangipahoa River carry?
About 1,100 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is Osyka Progress Rd. over Relief Tangipahoa River?
The structure is 171 ft (52.1 m) long with a longest span of 19 ft (5.8 m) and a deck 39 ft wide.
Who owns Osyka Progress Rd. over Relief Tangipahoa River?
It is owned by the County Highway Agency.