SR 315 over Clarendon CR Spillway
FairPanola County, Mississippi · 5.7 MI E I 55 · Structure no. 310031505404010
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 288 ft
- 3 main spans
- Daily traffic
- 1,400
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 315 over Clarendon CR Spillway is a prestressed concrete stringer/multi-beam or girder carrying SR 315 over Clarendon CR Spillway in Panola County, Mississippi. It was built in 1975, so it is 50 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,400 vehicles a day, roughly 14% of them trucks, projected to reach 1,400 by 2043. The structure is 288 ft (87.8 m) long and 37 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 315 over Clarendon CR Spillway built?
It was built in 1975, making it 50 years old in 2025.
What condition is SR 315 over Clarendon CR Spillway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does SR 315 over Clarendon CR Spillway carry?
About 1,400 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is SR 315 over Clarendon CR Spillway?
The structure is 288 ft (87.8 m) long with a longest span of 95 ft (29 m) and a deck 37 ft wide.
Who owns SR 315 over Clarendon CR Spillway?
It is owned by the State Highway Agency.