Old West Pt. Road over Sand Creek
GoodOktibbeha County, Mississippi · Sec 26 T19N R14E · Structure no. SA530000000A138
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 68 ft
- 3 main spans
- Daily traffic
- 2,400
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Old West Pt. Road over Sand Creek is a prestressed concrete stringer/multi-beam or girder carrying Old West Pt. Road over Sand Creek in Oktibbeha County, Mississippi. It was built in 2022, so it is 3 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,400 vehicles a day, roughly 8% of them trucks, projected to reach 3,600 by 2043. The structure is 68 ft (20.7 m) long and 39 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Old West Pt. Road over Sand Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is Old West Pt. Road over Sand Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Old West Pt. Road over Sand Creek carry?
About 2,400 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is Old West Pt. Road over Sand Creek?
The structure is 68 ft (20.7 m) long with a longest span of 30 ft (9.1 m) and a deck 39 ft wide.
Who owns Old West Pt. Road over Sand Creek?
It is owned by the City or Municipal Highway Agency.