Longview-Adaton RD over Trim Cane Creek
GoodOktibbeha County, Mississippi · Sec 4 T18N R13E · Structure no. SA530000000A066
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 140 ft
- 3 main spans
- Daily traffic
- 160
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Longview-Adaton RD over Trim Cane Creek is a prestressed concrete stringer/multi-beam or girder carrying Longview-Adaton RD over Trim Cane Creek in Oktibbeha County, Mississippi. It was built in 2021, so it is 4 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 160 vehicles a day, roughly 8% of them trucks, projected to reach 240 by 2041. The structure is 140 ft (42.7 m) long and 31 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Longview-Adaton RD over Trim Cane Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is Longview-Adaton RD over Trim Cane Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Longview-Adaton RD over Trim Cane Creek carry?
About 160 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is Longview-Adaton RD over Trim Cane Creek?
The structure is 140 ft (42.7 m) long with a longest span of 60 ft (18.3 m) and a deck 31 ft wide.
Who owns Longview-Adaton RD over Trim Cane Creek?
It is owned by the County Highway Agency.