US Bridges

Jack Spann RD over Woodard Creek Relief

Good

Noxubee County, Mississippi · Sec 32 T14N R19E B · Structure no. SA520000000A066

Built
2020
5 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
94 ft
300 main spans
Daily traffic
80
2024 count
Owner
County
County Highway Agency

About this bridge

Jack Spann RD over Woodard Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying Jack Spann RD over Woodard Creek Relief in Noxubee County, Mississippi. It was built in 2020, so it is 5 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, roughly 8% of them trucks, projected to reach 120 by 2044. The structure is 94 ft (28.5 m) long and 31 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesJack Spann RD
CrossesWoodard Creek Relief
LocationSec 32 T14N R19E B
RouteCounty Highway 168
Coordinates33.01734, -88.36751
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.3 US tons
Inventory rating60.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans300
Design loadHS 20
Structure length94 ft (28.5 m)
Longest span31 ft (9.5 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2024)
Projected traffic120 by 2044
Trucks8%
Lanes on structure20
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$650,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Jack Spann RD over Woodard Creek Relief built?

It was built in 2020, making it 5 years old in 2025.

What condition is Jack Spann RD over Woodard Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Jack Spann RD over Woodard Creek Relief carry?

About 80 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is Jack Spann RD over Woodard Creek Relief?

The structure is 94 ft (28.5 m) long with a longest span of 31 ft (9.5 m) and a deck 31 ft wide.

Who owns Jack Spann RD over Woodard Creek Relief?

It is owned by the County Highway Agency.