Simmons RD over Wolf Creek Relief
GoodNoxubee County, Mississippi · Sec 1 T14N R15E · Structure no. SA5200000000147
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 111 ft
- 3 main spans
- Daily traffic
- 90
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Simmons RD over Wolf Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying Simmons RD over Wolf Creek Relief in Noxubee County, Mississippi. It was built in 2001, so it is 24 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 90 vehicles a day, roughly 10% of them trucks, projected to reach 135 by 2043. The structure is 111 ft (33.8 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Simmons RD over Wolf Creek Relief built?
It was built in 2001, making it 24 years old in 2025.
What condition is Simmons RD over Wolf Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Simmons RD over Wolf Creek Relief carry?
About 90 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is Simmons RD over Wolf Creek Relief?
The structure is 111 ft (33.8 m) long with a longest span of 40 ft (12.2 m) and a deck 29 ft wide.
Who owns Simmons RD over Wolf Creek Relief?
It is owned by the County Highway Agency.