US Bridges

Hopewell Road over Relief for Tallasher Ck

Good

Newton County, Mississippi · Sec 9 T 7N R13E B · Structure no. SA5100000000106

Built
2006
19 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
240 ft
6 main spans
Daily traffic
150
2023 count
Owner
County
County Highway Agency

About this bridge

Hopewell Road over Relief for Tallasher Ck is a prestressed concrete stringer/multi-beam or girder carrying Hopewell Road over Relief for Tallasher Ck in Newton County, Mississippi. It was built in 2006, so it is 19 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 8% of them trucks, projected to reach 225 by 2043. The structure is 240 ft (73.2 m) long and 33 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesHopewell Road
CrossesRelief for Tallasher Ck
LocationSec 9 T 7N R13E B
RouteCounty Highway 43
Coordinates32.46372, -88.98231
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating71 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length240 ft (73.2 m)
Longest span40 ft (12.2 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2023)
Projected traffic225 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hopewell Road over Relief for Tallasher Ck built?

It was built in 2006, making it 19 years old in 2025.

What condition is Hopewell Road over Relief for Tallasher Ck in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Hopewell Road over Relief for Tallasher Ck carry?

About 150 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is Hopewell Road over Relief for Tallasher Ck?

The structure is 240 ft (73.2 m) long with a longest span of 40 ft (12.2 m) and a deck 33 ft wide.

Who owns Hopewell Road over Relief for Tallasher Ck?

It is owned by the County Highway Agency.