SR 407 over Relief Opening
FairMontgomery County, Mississippi · 12.2 MI N Choctaw Cl · Structure no. 310040704903040
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 201 ft
- 5 main spans
- Daily traffic
- 480
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 407 over Relief Opening is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 407 over Relief Opening in Montgomery County, Mississippi. It was built in 1991, so it is 34 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 480 vehicles a day, roughly 6% of them trucks, projected to reach 480 by 2043. The structure is 201 ft (61.4 m) long and 33 ft wide. If it were closed, the detour would be 29.8 mi (48 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 407 over Relief Opening built?
It was built in 1991, making it 34 years old in 2025.
What condition is SR 407 over Relief Opening in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SR 407 over Relief Opening carry?
About 480 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is SR 407 over Relief Opening?
The structure is 201 ft (61.4 m) long with a longest span of 40 ft (12.2 m) and a deck 33 ft wide.
Who owns SR 407 over Relief Opening?
It is owned by the State Highway Agency.