US Bridges

Lackey-Cockerham over Wilson Ck

Good

Monroe County, Mississippi · Sec 36 T14S R18W B · Structure no. SA4800000000123

Built
1997
28 years old
Condition
Good
inspected February 2024
Type
Channel Beam
Concrete
Length
93 ft
3 main spans
Daily traffic
310
2024 count
Owner
County
County Highway Agency

About this bridge

Lackey-Cockerham over Wilson Ck is a concrete channel beam carrying Lackey-Cockerham over Wilson Ck in Monroe County, Mississippi. It was built in 1997, so it is 28 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 310 vehicles a day, roughly 10% of them trucks, projected to reach 795 by 2043. The structure is 93 ft (28.3 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesLackey-Cockerham
CrossesWilson Ck
LocationSec 36 T14S R18W B
RouteCounty Highway 755
Coordinates33.80056, -88.37861
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.6 US tons
Inventory rating41.8 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length93 ft (28.3 m)
Longest span31 ft (9.4 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic310 (2024)
Projected traffic795 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lackey-Cockerham over Wilson Ck built?

It was built in 1997, making it 28 years old in 2025.

What condition is Lackey-Cockerham over Wilson Ck in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Lackey-Cockerham over Wilson Ck carry?

About 310 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Lackey-Cockerham over Wilson Ck?

The structure is 93 ft (28.3 m) long with a longest span of 31 ft (9.4 m) and a deck 31 ft wide.

Who owns Lackey-Cockerham over Wilson Ck?

It is owned by the County Highway Agency.