SR 309 over Red Banks Crk Tributary

Good

Marshall County, Mississippi · 3.1 MI S I 22 · Structure no. 310030904701290

Built
2021
4 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
301 ft
1 main span
Daily traffic
4,100
2023 count
Owner
State
State Highway Agency

About this bridge

SR 309 over Red Banks Crk Tributary is a prestressed concrete stringer/multi-beam or girder carrying SR 309 over Red Banks Crk Tributary in Marshall County, Mississippi. It was built in 2021, so it is 4 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,100 vehicles a day, roughly 10% of them trucks, projected to reach 4,100 by 2043. The structure is 301 ft (91.6 m) long and 47 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR 309
CrossesRed Banks Crk Tributary
Location3.1 MI S I 22
RouteState Highway 309
Coordinates34.81184, -89.68868
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.1 US tons
Inventory rating54.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHL 93
Structure length301 ft (91.6 m)
Longest span138 ft (42.1 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,100 (2023)
Projected traffic4,100 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 309 over Red Banks Crk Tributary built?

It was built in 2021, making it 4 years old in 2025.

What condition is SR 309 over Red Banks Crk Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SR 309 over Red Banks Crk Tributary carry?

About 4,100 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is SR 309 over Red Banks Crk Tributary?

The structure is 301 ft (91.6 m) long with a longest span of 138 ft (42.1 m) and a deck 47 ft wide.

Who owns SR 309 over Red Banks Crk Tributary?

It is owned by the State Highway Agency.