US Bridges

I 269 over Davis Road

Good

Marshall County, Mississippi · 2.6 MI N SR 309 · Structure no. 11002690470349B

Built
2016
9 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
288 ft
3 main spans
Daily traffic
7,000
2023 count
Owner
State
State Highway Agency

About this bridge

I 269 over Davis Road is a prestressed concrete continuous stringer/multi-beam or girder carrying I 269 over Davis Road in Marshall County, Mississippi. It was built in 2016, so it is 9 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,000 vehicles a day, roughly 21% of them trucks, projected to reach 21,000 by 2043. The structure is 288 ft (87.7 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 269
CrossesDavis Road
Location2.6 MI N SR 309
RouteInterstate 269
Coordinates34.91865, -89.65523
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.9 US tons
Inventory rating52.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length288 ft (87.7 m)
Longest span105 ft (32 m)
Deck width51 ft (15.5 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,000 (2023)
Projected traffic21,000 by 2043
Trucks21%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 269 over Davis Road built?

It was built in 2016, making it 9 years old in 2025.

What condition is I 269 over Davis Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I 269 over Davis Road carry?

About 7,000 vehicles per day (2023 count), of which roughly 21% are trucks.

How long is I 269 over Davis Road?

The structure is 288 ft (87.7 m) long with a longest span of 105 ft (32 m) and a deck 51 ft wide.

Who owns I 269 over Davis Road?

It is owned by the State Highway Agency.