Cavanaugh Road over Branch of Holiday Creek
GoodMarion County, Mississippi · Sec 6 T 5N R17W · Structure no. SA460000000A122
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected October 2023
- Type
- Channel Beam
- Concrete
- Length
- 57 ft
- 3 main spans
- Daily traffic
- 60
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Cavanaugh Road over Branch of Holiday Creek is a concrete channel beam carrying Cavanaugh Road over Branch of Holiday Creek in Marion County, Mississippi. It was built in 2019, so it is 6 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 60 vehicles a day, roughly 10% of them trucks, projected to reach 75 by 2046. The structure is 57 ft (17.4 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cavanaugh Road over Branch of Holiday Creek built?
It was built in 2019, making it 6 years old in 2025.
What condition is Cavanaugh Road over Branch of Holiday Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Cavanaugh Road over Branch of Holiday Creek carry?
About 60 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Cavanaugh Road over Branch of Holiday Creek?
The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.
Who owns Cavanaugh Road over Branch of Holiday Creek?
It is owned by the County Highway Agency.