US Bridges

Browning Road over Relief Ditch

Fair

Leflore County, Mississippi · Sec 12 T19N R 1E B · Structure no. SA4200000000032

Built
2009
16 years old
Condition
Fair
inspected January 2025
Type
Channel Beam
Concrete
Length
114 ft
6 main spans
Daily traffic
3,700
2015 count
Owner
County
County Highway Agency

About this bridge

Browning Road over Relief Ditch is a concrete channel beam carrying Browning Road over Relief Ditch in Leflore County, Mississippi. It was built in 2009, so it is 16 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,700 vehicles a day, roughly 8% of them trucks, projected to reach 5,550 by 2035. The structure is 114 ft (34.7 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesBrowning Road
CrossesRelief Ditch
LocationSec 12 T19N R 1E B
RouteCounty Highway 520
Coordinates33.51853, -90.14335
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating38.9 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans6
Design loadH 15
Structure length114 ft (34.7 m)
Longest span19 ft (5.8 m)
Deck width25 ft (7.5 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,700 (2015)
Projected traffic5,550 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$279,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Browning Road over Relief Ditch built?

It was built in 2009, making it 16 years old in 2025.

What condition is Browning Road over Relief Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Browning Road over Relief Ditch carry?

About 3,700 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is Browning Road over Relief Ditch?

The structure is 114 ft (34.7 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.

Who owns Browning Road over Relief Ditch?

It is owned by the County Highway Agency.