SR 7 over Landside Diversion Ditch
GoodLeflore County, Mississippi · 3.7 MI S Carroll Cl · Structure no. 310000704204020
- Built
- 1962
- 63 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 257 ft
- 5 main spans
- Daily traffic
- 4,200
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 7 over Landside Diversion Ditch is a prestressed concrete stringer/multi-beam or girder carrying SR 7 over Landside Diversion Ditch in Leflore County, Mississippi. It was built in 1962, so it is 63 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,200 vehicles a day, roughly 11% of them trucks, projected to reach 4,200 by 2043. The structure is 257 ft (78.3 m) long and 33 ft wide. If it were closed, the detour would be 39.8 mi (64 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 7 over Landside Diversion Ditch built?
It was built in 1962, making it 63 years old in 2025.
What condition is SR 7 over Landside Diversion Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does SR 7 over Landside Diversion Ditch carry?
About 4,200 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is SR 7 over Landside Diversion Ditch?
The structure is 257 ft (78.3 m) long with a longest span of 51 ft (15.5 m) and a deck 33 ft wide.
Who owns SR 7 over Landside Diversion Ditch?
It is owned by the State Highway Agency.