SR 145 over Coonewah Creek Relief
GoodLee County, Mississippi · 1.4 MI N SR 245 · Structure no. 310014504120580
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 161 ft
- 2 main spans
- Daily traffic
- 9,100
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 145 over Coonewah Creek Relief is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 145 over Coonewah Creek Relief in Lee County, Mississippi. It was built in 2002, so it is 23 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,100 vehicles a day, roughly 11% of them trucks, projected to reach 9,100 by 2043. The structure is 161 ft (49 m) long and 42 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 145 over Coonewah Creek Relief built?
It was built in 2002, making it 23 years old in 2025.
What condition is SR 145 over Coonewah Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does SR 145 over Coonewah Creek Relief carry?
About 9,100 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is SR 145 over Coonewah Creek Relief?
The structure is 161 ft (49 m) long with a longest span of 77 ft (23.5 m) and a deck 42 ft wide.
Who owns SR 145 over Coonewah Creek Relief?
It is owned by the State Highway Agency.