US Bridges

SR 427 over Relief

Good

Leake County, Mississippi · 0.1 MI S SR 16 · Structure no. 310042704000480

Built
1986
39 years old
Condition
Good
inspected January 2024
Type
Channel Beam
Concrete
Length
62 ft
2 main spans
Daily traffic
950
2023 count
Owner
State
State Highway Agency

About this bridge

SR 427 over Relief is a concrete channel beam carrying SR 427 over Relief in Leake County, Mississippi. It was built in 1986, so it is 39 years old, older than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 950 vehicles a day, roughly 10% of them trucks, projected to reach 950 by 2043. The structure is 62 ft (18.9 m) long and 31 ft wide. If it were closed, the detour would be 21.7 mi (35 km).

CarriesSR 427
CrossesRelief
Location0.1 MI S SR 16
RouteState Highway 427
Coordinates32.79626, -89.33061
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating76.8 US tons
Inventory rating46.2 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span31 ft (9.4 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic950 (2023)
Projected traffic950 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 427 over Relief built?

It was built in 1986, making it 39 years old in 2025.

What condition is SR 427 over Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does SR 427 over Relief carry?

About 950 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is SR 427 over Relief?

The structure is 62 ft (18.9 m) long with a longest span of 31 ft (9.4 m) and a deck 31 ft wide.

Who owns SR 427 over Relief?

It is owned by the State Highway Agency.