US Bridges

Chip Pickering DR over Ponta Creek

Fair

Lauderdale County, Mississippi · Sec 24 T 8N R16E B · Structure no. SA3800000000280

Built
2005
20 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
580
2021 count
Owner
County
County Highway Agency

About this bridge

Chip Pickering DR over Ponta Creek is a prestressed concrete stringer/multi-beam or girder carrying Chip Pickering DR over Ponta Creek in Lauderdale County, Mississippi. It was built in 2005, so it is 20 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 580 vehicles a day, roughly 10% of them trucks, projected to reach 870 by 2044. The structure is 120 ft (36.5 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesChip Pickering DR
CrossesPonta Creek
LocationSec 24 T 8N R16E B
RouteCounty Highway 1056
Coordinates32.52842, -88.60749
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.6 US tons
Inventory rating42.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length120 ft (36.5 m)
Longest span40 ft (12.2 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic580 (2021)
Projected traffic870 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$950,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Chip Pickering DR over Ponta Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is Chip Pickering DR over Ponta Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Chip Pickering DR over Ponta Creek carry?

About 580 vehicles per day (2021 count), of which roughly 10% are trucks.

How long is Chip Pickering DR over Ponta Creek?

The structure is 120 ft (36.5 m) long with a longest span of 40 ft (12.2 m) and a deck 31 ft wide.

Who owns Chip Pickering DR over Ponta Creek?

It is owned by the County Highway Agency.