NE Industrial Park over Sowashee Creek
GoodLauderdale County, Mississippi · Sec 34 T 7N R16E B · Structure no. SA3800000000207
- Built
- 1975
- 50 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 7,200
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
NE Industrial Park over Sowashee Creek is a prestressed concrete stringer/multi-beam or girder carrying NE Industrial Park over Sowashee Creek in Lauderdale County, Mississippi. It was built in 1975, so it is 50 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,200 vehicles a day, roughly 8% of them trucks, projected to reach 10,800 by 2044. The structure is 120 ft (36.6 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NE Industrial Park over Sowashee Creek built?
It was built in 1975, making it 50 years old in 2025.
What condition is NE Industrial Park over Sowashee Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does NE Industrial Park over Sowashee Creek carry?
About 7,200 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is NE Industrial Park over Sowashee Creek?
The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 31 ft wide.
Who owns NE Industrial Park over Sowashee Creek?
It is owned by the County Highway Agency.