US Bridges

I 59 over Over Dirt Trail

Good

Lauderdale County, Mississippi · 5.5 MI N Clarke Cl · Structure no. 11000590381438A

Built
1965
60 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
243 ft
4 main spans
Daily traffic
7,500
2023 count
Owner
State
State Highway Agency

About this bridge

I 59 over Over Dirt Trail is a prestressed concrete stringer/multi-beam or girder carrying I 59 over Over Dirt Trail in Lauderdale County, Mississippi. It was built in 1965, so it is 60 years old, older than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,500 vehicles a day, roughly 28% of them trucks, projected to reach 7,500 by 2043. The structure is 243 ft (74.1 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 59
CrossesOver Dirt Trail
Location5.5 MI N Clarke Cl
RouteInterstate 59
Coordinates32.29789, -88.80566
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80 US tons
Inventory rating47.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length243 ft (74.1 m)
Longest span60 ft (18.3 m)
Deck width33 ft (10 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,500 (2023)
Projected traffic7,500 by 2043
Trucks28%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$380 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 59 over Over Dirt Trail built?

It was built in 1965, making it 60 years old in 2025.

What condition is I 59 over Over Dirt Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does I 59 over Over Dirt Trail carry?

About 7,500 vehicles per day (2023 count), of which roughly 28% are trucks.

How long is I 59 over Over Dirt Trail?

The structure is 243 ft (74.1 m) long with a longest span of 60 ft (18.3 m) and a deck 33 ft wide.

Who owns I 59 over Over Dirt Trail?

It is owned by the State Highway Agency.