SR 589 over Black Creek Relief Ditch
GoodLamar County, Mississippi · 5.1 MI S US 98 · Structure no. 310058903701060
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected August 2024
- Type
- Channel Beam
- Concrete
- Length
- 310 ft
- 10 main spans
- Daily traffic
- 2,300
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 589 over Black Creek Relief Ditch is a concrete channel beam carrying SR 589 over Black Creek Relief Ditch in Lamar County, Mississippi. It was built in 2016, so it is 9 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,300 vehicles a day, roughly 11% of them trucks, projected to reach 2,300 by 2043. The structure is 310 ft (94.5 m) long and 32 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 589 over Black Creek Relief Ditch built?
It was built in 2016, making it 9 years old in 2025.
What condition is SR 589 over Black Creek Relief Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SR 589 over Black Creek Relief Ditch carry?
About 2,300 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is SR 589 over Black Creek Relief Ditch?
The structure is 310 ft (94.5 m) long with a longest span of 31 ft (9.4 m) and a deck 32 ft wide.
Who owns SR 589 over Black Creek Relief Ditch?
It is owned by the State Highway Agency.