Co.Road 445 over 875 over Relief Opening
FairLafayette County, Mississippi · Sec 28 T 9S R 2W B · Structure no. SA3600000000086
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 155 ft
- 5 main spans
- Daily traffic
- 520
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Co.Road 445 over 875 over Relief Opening is a prestressed concrete stringer/multi-beam or girder carrying Co.Road 445 over 875 over Relief Opening in Lafayette County, Mississippi. It was built in 1993, so it is 32 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 520 vehicles a day, roughly 5% of them trucks, projected to reach 800 by 2042. The structure is 155 ft (47.2 m) long and 31 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Co.Road 445 over 875 over Relief Opening built?
It was built in 1993, making it 32 years old in 2025.
What condition is Co.Road 445 over 875 over Relief Opening in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Co.Road 445 over 875 over Relief Opening carry?
About 520 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Co.Road 445 over 875 over Relief Opening?
The structure is 155 ft (47.2 m) long with a longest span of 31 ft (9.4 m) and a deck 31 ft wide.
Who owns Co.Road 445 over 875 over Relief Opening?
It is owned by the County Highway Agency.