US Bridges

Co.Road 225 over Relief

FairPosted for load

Lafayette County, Mississippi · Sec 20 T 8S R 2W · Structure no. SA3600000000050

Built
1993
32 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
57 ft
3 main spans
Daily traffic
80
2014 count
Owner
County
County Highway Agency

About this bridge

Co.Road 225 over Relief is a wood or timber stringer/multi-beam or girder carrying Co.Road 225 over Relief in Lafayette County, Mississippi. It was built in 1993, so it is 32 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 80 vehicles a day, projected to reach 120 by 2034. The structure is 57 ft (17.5 m) long and 20 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesCo.Road 225
CrossesRelief
LocationSec 20 T 8S R 2W
RouteCounty Highway 79
Coordinates34.36878, -89.4296
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating20 US tons
Inventory rating12.3 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans3
Design loadH 10
Structure length57 ft (17.5 m)
Longest span19 ft (5.9 m)
Deck width20 ft (6.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2014)
Projected traffic120 by 2034
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$204,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Co.Road 225 over Relief built?

It was built in 1993, making it 32 years old in 2025.

What condition is Co.Road 225 over Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Co.Road 225 over Relief carry?

About 80 vehicles per day (2014 count).

How long is Co.Road 225 over Relief?

The structure is 57 ft (17.5 m) long with a longest span of 19 ft (5.9 m) and a deck 20 ft wide.

Who owns Co.Road 225 over Relief?

It is owned by the County Highway Agency.