US Bridges

Holly Hailey RD over Wahalak Creek

Good

Kemper County, Mississippi · Sec 26 T12N R16E B · Structure no. SA3500000000112

Built
2000
25 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
24 ft
2 main spans
Daily traffic
60
2022 count
Owner
County
County Highway Agency

About this bridge

Holly Hailey RD over Wahalak Creek is a concrete culvert carrying Holly Hailey RD over Wahalak Creek in Kemper County, Mississippi. It was built in 2000, so it is 25 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, roughly 10% of them trucks, projected to reach 90 by 2044. The structure is 24 ft (7.2 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesHolly Hailey RD
CrossesWahalak Creek
LocationSec 26 T12N R16E B
RouteCounty Highway 414
Coordinates32.86527, -88.63551
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating43.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length24 ft (7.2 m)
Longest span12 ft (3.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2022)
Projected traffic90 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$550,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Holly Hailey RD over Wahalak Creek built?

It was built in 2000, making it 25 years old in 2025.

What condition is Holly Hailey RD over Wahalak Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Holly Hailey RD over Wahalak Creek carry?

About 60 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Holly Hailey RD over Wahalak Creek?

The structure is 24 ft (7.2 m) long with a longest span of 12 ft (3.6 m).

Who owns Holly Hailey RD over Wahalak Creek?

It is owned by the County Highway Agency.