US Bridges

Pgrove-Sville RD over Relief for Dry Creek

Good

Jones County, Mississippi · Sec 8 T 9N R10W B · Structure no. SA340000000A160

Built
2018
7 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
900
2025 count
Owner
County
County Highway Agency

About this bridge

Pgrove-Sville RD over Relief for Dry Creek is a concrete culvert carrying Pgrove-Sville RD over Relief for Dry Creek in Jones County, Mississippi. It was built in 2018, so it is 7 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 900 vehicles a day, roughly 8% of them trucks, projected to reach 1,350 by 2045. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPgrove-Sville RD
CrossesRelief for Dry Creek
LocationSec 8 T 9N R10W B
RouteCounty Highway 249
Coordinates31.76757, -89.01634
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating108 US tons
Inventory rating108 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length29 ft (8.8 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic900 (2025)
Projected traffic1,350 by 2045
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pgrove-Sville RD over Relief for Dry Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is Pgrove-Sville RD over Relief for Dry Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Pgrove-Sville RD over Relief for Dry Creek carry?

About 900 vehicles per day (2025 count), of which roughly 8% are trucks.

How long is Pgrove-Sville RD over Relief for Dry Creek?

The structure is 29 ft (8.8 m) long with a longest span of 12 ft (3.7 m).

Who owns Pgrove-Sville RD over Relief for Dry Creek?

It is owned by the County Highway Agency.