Macedonia RD over Courtney Creek
FairPosted for loadJones County, Mississippi · Sec 34 T 6N R12W B · Structure no. SA3400000000031
- Built
- 1964
- 61 years old, rebuilt 2019
- Condition
- Fair
- inspected January 2023
- Type
- Channel Beam
- Concrete
- Length
- 76 ft
- 4 main spans
- Daily traffic
- 100
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Macedonia RD over Courtney Creek is a concrete channel beam carrying Macedonia RD over Courtney Creek in Jones County, Mississippi. It was built in 1964 and reconstructed in 2019, so it is 61 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 6% of them trucks, projected to reach 150 by 2043. The structure is 76 ft (23.2 m) long and 22 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Macedonia RD over Courtney Creek built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2019.
What condition is Macedonia RD over Courtney Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Macedonia RD over Courtney Creek carry?
About 100 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is Macedonia RD over Courtney Creek?
The structure is 76 ft (23.2 m) long with a longest span of 19 ft (5.8 m) and a deck 22 ft wide.
Who owns Macedonia RD over Courtney Creek?
It is owned by the County Highway Agency.