Beacon St/I 59 SB over Pedestrian/Bicycle Path
GoodJones County, Mississippi · 0.5 MI N JCT US 84/SR 15 · Structure no. 17000590340940C
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 364 ft
- 7 main spans
- Daily traffic
- 1,200
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Beacon St/I 59 SB over Pedestrian/Bicycle Path is a prestressed concrete stringer/multi-beam or girder carrying Beacon St/I 59 SB over Pedestrian/Bicycle Path in Jones County, Mississippi. It was built in 2009, so it is 16 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,200 vehicles a day, roughly 18% of them trucks, projected to reach 1,200 by 2043. The structure is 364 ft (111 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Beacon St/I 59 SB over Pedestrian/Bicycle Path built?
It was built in 2009, making it 16 years old in 2025.
What condition is Beacon St/I 59 SB over Pedestrian/Bicycle Path in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does Beacon St/I 59 SB over Pedestrian/Bicycle Path carry?
About 1,200 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is Beacon St/I 59 SB over Pedestrian/Bicycle Path?
The structure is 364 ft (111 m) long with a longest span of 60 ft (18.3 m) and a deck 33 ft wide.
Who owns Beacon St/I 59 SB over Pedestrian/Bicycle Path?
It is owned by the State Highway Agency.