US Bridges

City St. Bellview over Bayou Relief

Good

Jackson County, Mississippi · Sec 15 T 7S R 6W · Structure no. SA3000000000106

Built
2006
19 years old
Condition
Good
inspected February 2024
Type
Channel Beam
Concrete
Length
100 ft
4 main spans
Daily traffic
2,600
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

City St. Bellview over Bayou Relief is a concrete channel beam carrying City St. Bellview over Bayou Relief in Jackson County, Mississippi. It was built in 2006, so it is 19 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,600 vehicles a day, roughly 10% of them trucks, projected to reach 4,500 by 2044. The structure is 100 ft (30.6 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCity St. Bellview
CrossesBayou Relief
LocationSec 15 T 7S R 6W
RouteCity Street 742
Coordinates30.4125, -88.54472
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.6 US tons
Inventory rating41.8 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length100 ft (30.6 m)
Longest span31 ft (9.5 m)
Deck width35 ft (10.7 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,600 (2024)
Projected traffic4,500 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was City St. Bellview over Bayou Relief built?

It was built in 2006, making it 19 years old in 2025.

What condition is City St. Bellview over Bayou Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does City St. Bellview over Bayou Relief carry?

About 2,600 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is City St. Bellview over Bayou Relief?

The structure is 100 ft (30.6 m) long with a longest span of 31 ft (9.5 m) and a deck 35 ft wide.

Who owns City St. Bellview over Bayou Relief?

It is owned by the City or Municipal Highway Agency.