SR 178 over Relief
FairItawamba County, Mississippi · 6.3 MI E Lee Cl · Structure no. 310017802910500
- Built
- 1931
- 94 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 90 ft
- 3 main spans
- Daily traffic
- 150
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 178 over Relief is a steel stringer/multi-beam or girder carrying SR 178 over Relief in Itawamba County, Mississippi. It was built in 1931, so it is 94 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 10% of them trucks, projected to reach 150 by 2043. The structure is 90 ft (27.4 m) long and 25 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 178 over Relief built?
It was built in 1931, making it 94 years old in 2025.
What condition is SR 178 over Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SR 178 over Relief carry?
About 150 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is SR 178 over Relief?
The structure is 90 ft (27.4 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.
Who owns SR 178 over Relief?
It is owned by the State Highway Agency.