SR 465 over Relief
FairPosted for loadIssaquena County, Mississippi · 8.7 MI W US 61 · Structure no. 310046502800870
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected August 2024
- Type
- Slab
- Concrete
- Length
- 100 ft
- 5 main spans
- Daily traffic
- 840
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 465 over Relief is a concrete slab carrying SR 465 over Relief in Issaquena County, Mississippi. It was built in 1955, so it is 70 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 840 vehicles a day, roughly 21% of them trucks, projected to reach 840 by 2043. The structure is 100 ft (30.5 m) long and 32 ft wide. If it were closed, the detour would be 26.7 mi (43 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 465 over Relief built?
It was built in 1955, making it 70 years old in 2025.
What condition is SR 465 over Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SR 465 over Relief carry?
About 840 vehicles per day (2023 count), of which roughly 21% are trucks.
How long is SR 465 over Relief?
The structure is 100 ft (30.5 m) long with a longest span of 20 ft (6.1 m) and a deck 32 ft wide.
Who owns SR 465 over Relief?
It is owned by the State Highway Agency.