US Bridges

Peach Tree Road over Drainage Ditch

Good

Humphreys County, Mississippi · Sec 33 T15N R 3W · Structure no. SA270000000A054

Built
2018
7 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete
Length
25 ft
1 main span
Daily traffic
5
2018 count
Owner
County
County Highway Agency

About this bridge

Peach Tree Road over Drainage Ditch is a concrete culvert carrying Peach Tree Road over Drainage Ditch in Humphreys County, Mississippi. It was built in 2018, so it is 7 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5 vehicles a day, projected to reach 8 by 2038. The structure is 25 ft (7.7 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPeach Tree Road
CrossesDrainage Ditch
LocationSec 33 T15N R 3W
RouteCounty Highway 148
Coordinates33.09485, -90.52559
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.1 US tons
Inventory rating42 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length25 ft (7.7 m)
Longest span16 ft (4.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5 (2018)
Projected traffic8 by 2038
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peach Tree Road over Drainage Ditch built?

It was built in 2018, making it 7 years old in 2025.

What condition is Peach Tree Road over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Peach Tree Road over Drainage Ditch carry?

About 5 vehicles per day (2018 count).

How long is Peach Tree Road over Drainage Ditch?

The structure is 25 ft (7.7 m) long with a longest span of 16 ft (4.9 m).

Who owns Peach Tree Road over Drainage Ditch?

It is owned by the County Highway Agency.