Holiday Road over Drainage Ditch
GoodHumphreys County, Mississippi · Sec 5 T13N R 3W · Structure no. SA2700000000001
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected October 2024
- Type
- Channel Beam
- Concrete
- Length
- 69 ft
- 3 main spans
- Daily traffic
- 40
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Holiday Road over Drainage Ditch is a concrete channel beam carrying Holiday Road over Drainage Ditch in Humphreys County, Mississippi. It was built in 1996, so it is 29 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 40 vehicles a day, projected to reach 60 by 2044. The structure is 69 ft (21 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Holiday Road over Drainage Ditch built?
It was built in 1996, making it 29 years old in 2025.
What condition is Holiday Road over Drainage Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Holiday Road over Drainage Ditch carry?
About 40 vehicles per day (2018 count).
How long is Holiday Road over Drainage Ditch?
The structure is 69 ft (21 m) long with a longest span of 31 ft (9.4 m) and a deck 31 ft wide.
Who owns Holiday Road over Drainage Ditch?
It is owned by the County Highway Agency.