US Bridges

SR 14 over Relief

Fair

Holmes County, Mississippi · 1.3 MI E US 51 · Structure no. 310001402607350

Built
1983
42 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
402 ft
10 main spans
Daily traffic
1,000
2023 count
Owner
State
State Highway Agency

About this bridge

SR 14 over Relief is a prestressed concrete stringer/multi-beam or girder carrying SR 14 over Relief in Holmes County, Mississippi. It was built in 1983, so it is 42 years old, older than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, roughly 11% of them trucks, projected to reach 1,000 by 2043. The structure is 402 ft (122.5 m) long and 43 ft wide. If it were closed, the detour would be 21.7 mi (35 km).

CarriesSR 14
CrossesRelief
Location1.3 MI E US 51
RouteState Highway 14
Coordinates32.9586, -89.8978
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.9 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans10
Design loadHS 20
Structure length402 ft (122.5 m)
Longest span40 ft (12.2 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2023)
Projected traffic1,000 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 14 over Relief built?

It was built in 1983, making it 42 years old in 2025.

What condition is SR 14 over Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does SR 14 over Relief carry?

About 1,000 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is SR 14 over Relief?

The structure is 402 ft (122.5 m) long with a longest span of 40 ft (12.2 m) and a deck 43 ft wide.

Who owns SR 14 over Relief?

It is owned by the State Highway Agency.