Kickapoo RD over Bogue Chitto Relief

Good

Hinds County, Mississippi · Sec 5 T 6N R 1W B · Structure no. SA250000000A196

Built
2021
4 years old
Condition
Good
inspected January 2024
Type
Channel Beam
Concrete
Length
93 ft
3 main spans
Daily traffic
2,200
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Kickapoo RD over Bogue Chitto Relief is a concrete channel beam carrying Kickapoo RD over Bogue Chitto Relief in Hinds County, Mississippi. It was built in 2021, so it is 4 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,200 vehicles a day, roughly 8% of them trucks, projected to reach 3,300 by 2044. The structure is 93 ft (28.3 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesKickapoo RD
CrossesBogue Chitto Relief
LocationSec 5 T 6N R 1W B
RouteCity Street 415
Coordinates32.40029, -90.31423
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.2 US tons
Inventory rating37.1 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length93 ft (28.3 m)
Longest span31 ft (9.4 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,200 (2024)
Projected traffic3,300 by 2044
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Kickapoo RD over Bogue Chitto Relief built?

It was built in 2021, making it 4 years old in 2025.

What condition is Kickapoo RD over Bogue Chitto Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Kickapoo RD over Bogue Chitto Relief carry?

About 2,200 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is Kickapoo RD over Bogue Chitto Relief?

The structure is 93 ft (28.3 m) long with a longest span of 31 ft (9.4 m) and a deck 33 ft wide.

Who owns Kickapoo RD over Bogue Chitto Relief?

It is owned by the City or Municipal Highway Agency.