Clinton Parkway over Railroad & Leake Street
FairHinds County, Mississippi · Sec 29 T 6N R 1W · Structure no. SA2500000000412
- Built
- 2001
- 24 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 804 ft
- 9 main spans
- Daily traffic
- 22,000
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Clinton Parkway over Railroad & Leake Street is a prestressed concrete stringer/multi-beam or girder carrying Clinton Parkway over Railroad & Leake Street in Hinds County, Mississippi. It was built in 2001, so it is 24 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,000 vehicles a day, roughly 8% of them trucks, projected to reach 24,200 by 2044. The structure is 804 ft (245.1 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clinton Parkway over Railroad & Leake Street built?
It was built in 2001, making it 24 years old in 2025.
What condition is Clinton Parkway over Railroad & Leake Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Clinton Parkway over Railroad & Leake Street carry?
About 22,000 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is Clinton Parkway over Railroad & Leake Street?
The structure is 804 ft (245.1 m) long with a longest span of 110 ft (33.5 m) and a deck 67 ft wide.
Who owns Clinton Parkway over Railroad & Leake Street?
It is owned by the City or Municipal Highway Agency.