US Bridges

SR 67 over Tchoutacabouffa Relief

Good

Harrison County, Mississippi · 0.9 MI N I 10 · Structure no. 31000670240051B

Built
2009
16 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
317 ft
8 main spans
Daily traffic
10,500
2023 count
Owner
State
State Highway Agency

About this bridge

SR 67 over Tchoutacabouffa Relief is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 67 over Tchoutacabouffa Relief in Harrison County, Mississippi. It was built in 2009, so it is 16 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,500 vehicles a day, roughly 5% of them trucks, projected to reach 10,500 by 2043. The structure is 317 ft (96.5 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 67
CrossesTchoutacabouffa Relief
Location0.9 MI N I 10
RouteState Highway 67
Coordinates30.46482, -88.90409
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating39.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20
Structure length317 ft (96.5 m)
Longest span39 ft (12 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,500 (2023)
Projected traffic10,500 by 2043
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 67 over Tchoutacabouffa Relief built?

It was built in 2009, making it 16 years old in 2025.

What condition is SR 67 over Tchoutacabouffa Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does SR 67 over Tchoutacabouffa Relief carry?

About 10,500 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is SR 67 over Tchoutacabouffa Relief?

The structure is 317 ft (96.5 m) long with a longest span of 39 ft (12 m) and a deck 42 ft wide.

Who owns SR 67 over Tchoutacabouffa Relief?

It is owned by the State Highway Agency.