US Bridges

Tie Plant Rd. 80 over Batupan Bogue Creek

Fair

Grenada County, Mississippi · Sec 28 T22N R 5E · Structure no. SA2200000000036

Built
1977
48 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
660 ft
15 main spans
Daily traffic
100
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Tie Plant Rd. 80 over Batupan Bogue Creek is a prestressed concrete stringer/multi-beam or girder carrying Tie Plant Rd. 80 over Batupan Bogue Creek in Grenada County, Mississippi. It was built in 1977, so it is 48 years old, older than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, projected to reach 150 by 2035. The structure is 660 ft (201.2 m) long and 29 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesTie Plant Rd. 80
CrossesBatupan Bogue Creek
LocationSec 28 T22N R 5E
RouteCity Street 90
Coordinates33.74049, -89.77471
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating45.7 US tons
Inventory rating18.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans15
Design loadHS 15
Structure length660 ft (201.2 m)
Longest span100 ft (30.5 m)
Deck width29 ft (8.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2015)
Projected traffic150 by 2035
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tie Plant Rd. 80 over Batupan Bogue Creek built?

It was built in 1977, making it 48 years old in 2025.

What condition is Tie Plant Rd. 80 over Batupan Bogue Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Tie Plant Rd. 80 over Batupan Bogue Creek carry?

About 100 vehicles per day (2015 count).

How long is Tie Plant Rd. 80 over Batupan Bogue Creek?

The structure is 660 ft (201.2 m) long with a longest span of 100 ft (30.5 m) and a deck 29 ft wide.

Who owns Tie Plant Rd. 80 over Batupan Bogue Creek?

It is owned by the City or Municipal Highway Agency.