US 84 over Bowie River
GoodCovington County, Mississippi · 1.0 MI W SR 35 · Structure no. 21000840161098B
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 250 ft
- 5 main spans
- Daily traffic
- 2,600
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 84 over Bowie River is a prestressed concrete continuous stringer/multi-beam or girder carrying US 84 over Bowie River in Covington County, Mississippi. It was built in 2002, so it is 23 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,600 vehicles a day, roughly 30% of them trucks, projected to reach 3,200 by 2043. The structure is 250 ft (76.2 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 84 over Bowie River built?
It was built in 2002, making it 23 years old in 2025.
What condition is US 84 over Bowie River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does US 84 over Bowie River carry?
About 2,600 vehicles per day (2023 count), of which roughly 30% are trucks.
How long is US 84 over Bowie River?
The structure is 250 ft (76.2 m) long with a longest span of 50 ft (15.2 m) and a deck 43 ft wide.
Who owns US 84 over Bowie River?
It is owned by the State Highway Agency.