Sylvarena Road over Relief for Bayou Pierre
FairCopiah County, Mississippi · Sec 24 T 9N R 7E B · Structure no. SA1500000000099
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected March 2023
- Type
- Channel Beam
- Concrete
- Length
- 95 ft
- 5 main spans
- Daily traffic
- 1,200
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Sylvarena Road over Relief for Bayou Pierre is a concrete channel beam carrying Sylvarena Road over Relief for Bayou Pierre in Copiah County, Mississippi. It was built in 1978, so it is 47 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,200 vehicles a day, roughly 8% of them trucks, projected to reach 2,100 by 2045. The structure is 95 ft (29 m) long and 31 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sylvarena Road over Relief for Bayou Pierre built?
It was built in 1978, making it 47 years old in 2025.
What condition is Sylvarena Road over Relief for Bayou Pierre in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Sylvarena Road over Relief for Bayou Pierre carry?
About 1,200 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Sylvarena Road over Relief for Bayou Pierre?
The structure is 95 ft (29 m) long with a longest span of 19 ft (5.8 m) and a deck 31 ft wide.
Who owns Sylvarena Road over Relief for Bayou Pierre?
It is owned by the County Highway Agency.