US Bridges

New Hope RD over Trib to Pearl River

FairPosted for load

Copiah County, Mississippi · Sec 28 T 1N R 1E · Structure no. SA1500000000011

Built
2005
20 years old
Condition
Fair
inspected October 2024
Type
Channel Beam
Concrete
Length
57 ft
3 main spans
Daily traffic
50
2024 count
Owner
County
County Highway Agency

About this bridge

New Hope RD over Trib to Pearl River is a concrete channel beam carrying New Hope RD over Trib to Pearl River in Copiah County, Mississippi. It was built in 2005, so it is 20 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 50 vehicles a day, projected to reach 100 by 2048. The structure is 57 ft (17.4 m) long and 25 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesNew Hope RD
CrossesTrib to Pearl River
LocationSec 28 T 1N R 1E
RouteCounty Highway 31
Coordinates31.90208, -90.20433
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating27.3 US tons
Inventory rating16.5 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadH 15
Structure length57 ft (17.4 m)
Longest span19 ft (5.8 m)
Deck width25 ft (7.5 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2024)
Projected traffic100 by 2048
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$228,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was New Hope RD over Trib to Pearl River built?

It was built in 2005, making it 20 years old in 2025.

What condition is New Hope RD over Trib to Pearl River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does New Hope RD over Trib to Pearl River carry?

About 50 vehicles per day (2024 count).

How long is New Hope RD over Trib to Pearl River?

The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.

Who owns New Hope RD over Trib to Pearl River?

It is owned by the County Highway Agency.