US 49 over Relief Opening
FairPosted for loadCoahoma County, Mississippi · 0.3 MI E Miss/Ark ST Line · Structure no. 210004901433680
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,000 ft
- 20 main spans
- Daily traffic
- 3,800
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 49 over Relief Opening is a prestressed concrete stringer/multi-beam or girder carrying US 49 over Relief Opening in Coahoma County, Mississippi. It was built in 1961, so it is 64 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 3,800 vehicles a day, roughly 18% of them trucks, projected to reach 3,800 by 2043. The structure is 1,000 ft (304.8 m) long and 28 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 49 over Relief Opening built?
It was built in 1961, making it 64 years old in 2025.
What condition is US 49 over Relief Opening in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does US 49 over Relief Opening carry?
About 3,800 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is US 49 over Relief Opening?
The structure is 1,000 ft (304.8 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.
Who owns US 49 over Relief Opening?
It is owned by the State Highway Agency.