CO RD 130 over Relief Chickasawhay R
FairPosted for loadClarke County, Mississippi · Sec 3 T 2N R15E B · Structure no. SA1200000000042
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 160 ft
- 4 main spans
- Daily traffic
- 200
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 130 over Relief Chickasawhay R is a prestressed concrete stringer/multi-beam or girder carrying CO RD 130 over Relief Chickasawhay R in Clarke County, Mississippi. It was built in 1977, so it is 48 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 200 vehicles a day, roughly 8% of them trucks, projected to reach 300 by 2044. The structure is 160 ft (48.8 m) long and 29 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 130 over Relief Chickasawhay R built?
It was built in 1977, making it 48 years old in 2025.
What condition is CO RD 130 over Relief Chickasawhay R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does CO RD 130 over Relief Chickasawhay R carry?
About 200 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is CO RD 130 over Relief Chickasawhay R?
The structure is 160 ft (48.8 m) long with a longest span of 40 ft (12.2 m) and a deck 29 ft wide.
Who owns CO RD 130 over Relief Chickasawhay R?
It is owned by the County Highway Agency.