CO RD 250 over Br of Shubuta Creek
FairPosted for loadClarke County, Mississippi · Sec 22 T 1N R14E B · Structure no. SA1200000000010
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected October 2024
- Type
- Channel Beam
- Concrete
- Length
- 57 ft
- 300 main spans
- Daily traffic
- 240
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 250 over Br of Shubuta Creek is a concrete channel beam carrying CO RD 250 over Br of Shubuta Creek in Clarke County, Mississippi. It was built in 1972, so it is 53 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 240 vehicles a day, roughly 10% of them trucks, projected to reach 360 by 2044. The structure is 57 ft (17.4 m) long and 25 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 250 over Br of Shubuta Creek built?
It was built in 1972, making it 53 years old in 2025.
What condition is CO RD 250 over Br of Shubuta Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does CO RD 250 over Br of Shubuta Creek carry?
About 240 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is CO RD 250 over Br of Shubuta Creek?
The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.
Who owns CO RD 250 over Br of Shubuta Creek?
It is owned by the County Highway Agency.