US Bridges

Jerusalem Road over Tibby Creek

Good

Choctaw County, Mississippi · Sec 19 T16N R11E · Structure no. SA100000000A105

Built
2020
5 years old
Condition
Good
inspected August 2024
Type
Channel Beam
Concrete
Length
93 ft
3 main spans
Daily traffic
50
2022 count
Owner
County
County Highway Agency

About this bridge

Jerusalem Road over Tibby Creek is a concrete channel beam carrying Jerusalem Road over Tibby Creek in Choctaw County, Mississippi. It was built in 2020, so it is 5 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 75 by 2042. The structure is 93 ft (28.3 m) long and 28 ft wide. If it were closed, the detour would be 34.2 mi (55 km).

CarriesJerusalem Road
CrossesTibby Creek
LocationSec 19 T16N R11E
RouteCounty Highway 0
Coordinates33.23962, -89.19514
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.2 US tons
Inventory rating37.1 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length93 ft (28.3 m)
Longest span31 ft (9.4 m)
Deck width28 ft (8.6 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2022)
Projected traffic75 by 2042
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed34.2 mi (55 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Jerusalem Road over Tibby Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is Jerusalem Road over Tibby Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Jerusalem Road over Tibby Creek carry?

About 50 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is Jerusalem Road over Tibby Creek?

The structure is 93 ft (28.3 m) long with a longest span of 31 ft (9.4 m) and a deck 28 ft wide.

Who owns Jerusalem Road over Tibby Creek?

It is owned by the County Highway Agency.