US Bridges

Reform-Sturgis RD over Bywy Canal

Good

Choctaw County, Mississippi · Sec 7 T18N R10E B · Structure no. SA1000000000064

Built
1992
33 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
160 ft
1 main span
Daily traffic
50
2023 count
Owner
County
County Highway Agency

About this bridge

Reform-Sturgis RD over Bywy Canal is a prestressed concrete stringer/multi-beam or girder carrying Reform-Sturgis RD over Bywy Canal in Choctaw County, Mississippi. It was built in 1992, so it is 33 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 75 by 2043. The structure is 160 ft (48.8 m) long and 29 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesReform-Sturgis RD
CrossesBywy Canal
LocationSec 7 T18N R10E B
RouteCounty Highway 137
Coordinates33.43122, -89.29421
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.9 US tons
Inventory rating29.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length160 ft (48.8 m)
Longest span80 ft (24.4 m)
Deck width29 ft (8.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic75 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Reform-Sturgis RD over Bywy Canal built?

It was built in 1992, making it 33 years old in 2025.

What condition is Reform-Sturgis RD over Bywy Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Reform-Sturgis RD over Bywy Canal carry?

About 50 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Reform-Sturgis RD over Bywy Canal?

The structure is 160 ft (48.8 m) long with a longest span of 80 ft (24.4 m) and a deck 29 ft wide.

Who owns Reform-Sturgis RD over Bywy Canal?

It is owned by the County Highway Agency.